HHS-OASH-2026-0397-2950 https://www.regulations.gov/comment/HHS-OASH-2026-0397-2950 With the insane major push to build hyper scale data centers, a push that goes with them are the high voltage 765 kv power lines. There are very few of these in existence and essentially very limited studies regarding power lines at all and no long term scientific evaluations. Before these lines and hyper scale data centers are forced upon us, a complete and thorough scientific, unbiased evaluation needs to be made. This push with no accountability is not just unacceptable, it defies logic at all levels. The only thing it does is put dollars in large corporations pockets. Where are the wildlife studies? The studies for farm animals? Habitat? No one taking any responsibility that is ruining our country and harming everything and everyone we know. Stray voltage is a real thing, and the lawsuits and awards are reflecting that. The explanation being farm animals are closer to it and on their feet? What about the children and pets they play outside? What about the increased diseases? What about getting shocked when touching wet ground or working in a barn? This should not be an afterthought. Full and complete independent studies that include long term results should be done now and stop the cart before the horse. There will be nothing left of our great state of Wisconsin or the United States. Greed needs to be left out of the equation.